AHMC SETON MEDICAL CENTER, Sterile Processing Department

LOCATION: Daly City, CA

SIZE: 10,000 sf

DURATION: 16 weeks

DELIVERY METHOD: Design-Build

TEAM: Peacock Construction, TreanorHL, Miyamoto Int’l, Contra Costa Electric, Control Air Enterprises, Lescure Company

Peacock conducted a complete remodel, refresh, and infrastructure upgrades for the sterile processing department as part of Seton’s major seismic retrofit.

We executed the work in a fully functional OR Department that required an elevated focus on infection control measures. We were able to completely refurbish the sterile processing department with no shutdowns, coordinating all work to limit the impact on patient care.  

CHALLENGES

This Progressive Design-Build project had to meet a challenging schedule and budget requirements. While the previous GC had recommended a temporary trailer at twice our cost, we provided a permanent solution in less time and with less money by relocating services into the existing Ambulatory Surgery Center adjacent to the hospital. 

Previous
Previous

301 Howard, Tenant Amenity Suite and Fitness center

Next
Next

Stripe